Storm Drainage Electric Gas Systems B600 Light Duty Square Manhole Grating

Product Details
Customization: Available
Material: Steel
Shape: Round

360° Virtual Tour

Diamond Member Since 2022

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (29)
  • Storm Drainage Electric Gas Systems B600 Light Duty Square Manhole Grating
  • Storm Drainage Electric Gas Systems B600 Light Duty Square Manhole Grating
  • Storm Drainage Electric Gas Systems B600 Light Duty Square Manhole Grating
  • Storm Drainage Electric Gas Systems B600 Light Duty Square Manhole Grating
  • Storm Drainage Electric Gas Systems B600 Light Duty Square Manhole Grating
  • Storm Drainage Electric Gas Systems B600 Light Duty Square Manhole Grating
Find Similar Products
  • Overview
  • Product Description
Overview

Basic Info.

Model NO.
400*400.500*500, etc

Product Description

Product Description
Weight 60kg-123kg
Surface Treatment Black Bitumen/Epoxy Painting
Service ODM & OEM
Color Black
Application Road Traffic Safety, Road Facilities
Ductile Iron Manhole Cover and Grating EN124:1994 Material: GGG500-7
Class Application Dimension (Frame mm)
A15 Pedestrians, Pedal Cyclists Dia760
B125 Footways, Pedestrians, Car parks 290*290, dia800
C250 Kerbside channel of roads 700*700, 600*800
D400 Road, hard shoulders etc. 850*850, 920*920
E600 Docks, aircraft pavements etc as per your demands
F900 Aircraft pavements etc. as per your demands
Storm Drainage Electric Gas Systems B600 Light Duty Square Manhole Grating
Storm Drainage Electric Gas Systems B600 Light Duty Square Manhole GratingStorm Drainage Electric Gas Systems B600 Light Duty Square Manhole Grating

Storm Drainage Electric Gas Systems B600 Light Duty Square Manhole GratingStorm Drainage Electric Gas Systems B600 Light Duty Square Manhole GratingStorm Drainage Electric Gas Systems B600 Light Duty Square Manhole GratingStorm Drainage Electric Gas Systems B600 Light Duty Square Manhole GratingAbout Us

Anhui Feilong New Material Co., Ltd. is a company which is integrating R&D, manufacturing and sale in one for municipal supporting products, especially for all kinds of manhole covers, trench covers, draining system, etc. By focusing on R&D and constantly investing in improving manufacturing capabilities and processes, Feilong is committed to pushing the industry forward with the development of quality standards and innovations to meet the ever-changing demands of customers. Located in Lintou town, Hanshan county, which is known as the "Hometown of Casting in East China", Feilong Group owns a 150,000 square meter factory, including 9 standardized digital workshops, 200 units(sets) hydraulic equipments, 7 digital automated production lines and over 500 employees. Always uphold the spirit of craftsmanship, we've passed ISO9001, ISO14001 and OHSAS1800, etc. Untill now, Feilong has more than 800 product specifications and has won dozens of national patents. There are totally 4 series product lines: high strenghth composite matertial products, ductile cast iron material products, new SMC material products and stainless steel products.
Standing firmly by quality, winning firmly by proficient, in the past years of development, Feilong continuous growth and brand positioning are all relied onto the long term partnership with variety channel customers.
FAQ

1.Do you support customization? Can I have my logo on the product?
Yes, we provide both ODM&OEM service, if you need customized service, you should only provide the product drawings and show us the detailed request.
2.How about the payment?
Generally, 30% deposite T/T before production ,70% balance before shippment.
3.How can you guarantee the quality of mass production?
Before mass production, we can send sample to comfirm first. During the production, we have QC to make sure every process is under controled. And the final inspection before shipment. The testing video would be sent before shipment.
4.How long is your delivery time?
Owning a 150,000 square meter plant and over 500 employees, generally a regular 20ft order would be delivered within 15 days.
5.How long it will be taken to develop a new molding according to the drawings?
Generally speaking, it would within 20-30 days.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier